14. Shingles
Begin putting down shingles at the bottom edge where a double layer is installed. Each shingle overlaps the course below and is held in place with four roofing nails. The nails are placed so that the heads are concealed under the next row.
15. Windows
With the shingles securely in place, it is time to install the roof windows, which are what makes this a "solar" shed. First, run strips of double stick tape along the tops of the roof trusses. Set the window panels in place resting on top of the tape. |